Sayreville

  • In Service: Fiscal 2019 (September 2019)
  • Cost: $13.8 Million
  • Capacity: 4.4 Megawatts
  • Location: Sayreville, NJ
  • Attributes: Floating solar (largest floating solar array in North America to date), net metered.

Annual Carbon Reduction

  • Tons: 10,430
  • Passenger Car Equivalents: 2000
Sayreville
Garfield

Garfield

  • In Service: Fiscal 2019 (September 2019)
  • Cost: $9.6 Million
  • Capacity: 2.9 Megawatts
  • Location: Garfield, NJ
  • Attributes: Two roof mounted, net metered

Annual Carbon Reduction

  • Tons: 2,280
  • Passenger Car Equivalents: 400

Milford

  • In Service: Fiscal 2019 (September 2019)
  • Cost: $19.0 Million,
  • Capacity: 9.0 Megawatts
  • Location: Milford, NJ
  • Attributes: Ground mount, grid connected

Annual Carbon Reduction

  • Tons: 8,650
  • Passenger Car Equivalents:1,660
Milford
Union Beach

Union Beach

  • In Service: Fiscal 2019 (July 2019)
  • Cost: $20.4 Million
  • Capacity: 6.8 Megawatts
  • Location: Union Beach, NJ
  • Attributes: Ground mounted, net metered

Annual Carbon Reduction

  • Tons: 6,550
  • Passenger Car Equivalents: 1,260

Washington

  • In Service: Fiscal 2019 (June 2019)
  • Cost: $22.0 Million
  • Capacity: 10.0 Megawatts
  • Location: Washington, NJ
  • Attributes: Ground mounted, grid connected

Annual Carbon Reduction

  • Tons: 9,760
  • Passenger Car Equivalents: 1,880
Washington
NJ Land

NJ Land 1

  • In Service: Fiscal 2019 (October 2019)
  • Cost: $27.8 Million
  • Capacity: 9.2 Megawatts
  • Location: Springfield Township, NJ
  • Attributes: Ground mounted, net metered

Annual Carbon Reduction

  • Tons: 8,910
  • Passenger Car Equivalents: 1,720

Quakertown

  • In Service: Fiscal 2019 (October 2019)
  • Cost: $20.7 Million
  • Capacity: 10.0 Megawatts
  • Location: Franklin Township, NJ
  • Attributes: Ground mounted, net metered

Annual Carbon Reduction

  • Tons: 9,760
  • Passenger Car Equivalents: 1,880
Quakertown
Old Bridge

Old Bridge

  • In Service: Fiscal 2018 (July 2018)
  • Cost: $22.2 Million
  • Capacity: 10.7 Megawatts
  • Location: Old Bridge Township, NJ
  • Attributes: Ground mounted, grid connected

Annual Carbon Reduction

  • Tons: 10,430
  • Passenger Car Equivalents: 2,000

Total Annual Carbon Reduction

  • Tons: 66,770
  • Passenger Car Equivalents: 12,840